Compressed  Air  Freeze  Dryer

 

 

User’s Manual

 

Maintenance

 

 

 

 

I. Foreword:

This manual mainly instructs you on how to use the equipment properly. Its purpose is to prolong the service life and diminish operational failure, so as to guarantee the compressed air quality. It also gives relevant information on the equipment for reference. So please read the manual carefully before use, and take operation and maintenance according to the instructions for fear of equipment breakdown.

II. Functions:

       The key function of the cooling-type compressed air freeze dryer is to remove the moisture of compressed air. With a cold media heat exchanger (evaporator), it can drop the compressed air temperature to 10℃ and condense the moisture or water drops in the compressed air. Then it separates the air from water drops with a separator. Then the water drops are discharged from the system by an automatic drainer, which puts the pre-cooling process. Under normal situation, the water content of the precooled compressed air is about 0.59g/m3, and the dewatering rate is up to 93%. The user can select the right model or add filters according to the actual condition.

III. High Efficiency from the Excellent Jiasheng Design:

The low energy consumption and low pressure drops enable the lowest operating cost, so it is energy-efficient. The large ‘Gas-to-Gas’ heat exchanger can remove half of the heat load in the air, thus to narrow the cooling system and reduce the power consumption to the utmost, which guarantees sufficient cooling and frees the downstream pipeline from condensation; With large covering, the evaporator enables to cool down the compressed air evenly to dew point temperature. The multi-channel design of the coolant can make the best use of the available cooling capacity and free the evaporator from frost.

IV. Cold Media System Flow:

       Compressed by the cold-media compressor, the cold media will turn into high-pressure and high-temperature gas. After radiated by the air-cooling condenser, it will be condensed to liquefaction. And then the moisture and impurity are removed from its pipeline with a dry filter. And then the high-pressure liquid cold media will go through the capillary throttle before turning into low-pressure and low-temperature liquid to enter the evaporator. Then it absorbs the heat from the compressed air, and is gasified into the low-temperature gaseous cold media, and flows back to the compressor through the liquid-gas separator, which puts the refrigeration cycle to an end.

V. Installation Instructions:

Location

5.1 Choose a cool and draughty place as the best location for installation.

5.2 Installation of the machines the ambient temperature is limited to 35℃

5.3 Do not install it outdoors, in a damp and dusty place, or in a corrosive and polluted place.  

5.4 The location shall be one meter away from the wall and two meters away from other machines, which facilitates cleaning and maintenance.  

5.5 Install it horizontally to facilitate drainage.  

Wiring

5.6  Install a dedicated switch beside the power supply of the dryer for protection. For more information please refer to relevant instruction manuals. 

5.7  The supply voltage cannot exceed the rated voltage.(Label specification±5%)

5.8  The power cord’s specifications depend on the current and the length of wires. 

5.9  Do not share the protection switch with any other equipment.  

5.10 Connect the ground wire properly. 

III. Operations:

6.1 Verify that the power supply is under normal voltage (label specification±5%).

6.2 Verify that the environmental temperature is normal.

6.3 Verify that the compressed air has not yet entered the dryer. (Stop the air compressor from running, or fasten the valves, and turn on the air bypass valve.)

6.4 Verify that the cold media meter is under normal pressure. (Before running, the cold media pressure must be kept around 7~11kgf/cm2,and not less than 6.0kgf/cm2 in winters).

6.5 Verify that the cooling water intake is under normal pressure and humidity. (Hydraulic pressure: 2~4kgf/cm2, water temperature: max. 35°C) 

6.6 Verify that the exhaust rate of the air compressor matches the processing capacity of the freeze dryer.    

During Operation

6.7 Turn on the power, and the dryer will begin to work. 

6.8 Verify that the dryer is under normal working voltage.(See label.)

6.9 Verify that the cooling water intake/outtake is under normal temperature difference.(5~10°C)

6.10 Verify that the cooler’s fan motor is running well.  

6.11 After ten minutes of running, let the compressed air in the dryer.(Start up the air compressor or open the valves slowly and close the air bypass valve.) 

6.12 Check whether there is air leakage.  

6.13 Verify that the intake compressed air temperature is normal.(High temperature: WCD≤80°C,Low temperature: WAD≤40°C) 

6.14 Verify that the intake compressed air is under normal pressure.(See label.)

6.15 Verify that the passageway of the dryer is under normal temperature difference.(Temperature difference:10~30°C)。

6.16 Verify that the cold media is under normal high/low pressure. (High pressure under zero load:13.5~15.5kgf/cm2, Low pressure:3.6~4.0kgf/cm2)。

6.17 If the water-cooling model is under abnormal high pressure, please adjust the water-regulating valve at the cooling water entrance. (Clockwise to decrease the pressure, and vice versa.) 

6.18 After 30 minutes of operation, check whether the drainage system is under control.(Generally speaking, the high-pressure drainer will drain automatically.)

When all the above items are normal, the operation is under control. 

Caution:

1、Idling should be not more than 30 minutes.  

2、Restart the machine 5 minutes after shutdown for fear of damaging the compressor.  

IV. Routine Maintenance:

7.1 Check the high-pressure drainer every day for fear that it might be jammed to stop draining;clean it once it is jammed;clean it once a week(depending on the actual situation).

7.2 Check whether the cooling water is under normal condition every day (Standard hydraulic pressure: 2—4kgf/cm2,intake water temperature: below 35°C.

7.3 For the water-cooling model,please clean the water filter every three months or when the high pressure of the cold media is over 17kgf/cm2. If the pressure of the cold media is still off standard, please clean the condenser and the front cooler.  

7.4 Open the drainage valve at least twice a day.  

7.5 For large models, please coordinate with our company on a thorough maintenance.

VI.  Multiple Protection System:

          Overcurrent protection;Compressor overheat protection. The multiple protection system ensures normal operation of the equipment and rest you assured.  

 

 

IX. Failure and Solutions:

State

Cause

Solutions

Abnormal power supply  

Master power supply protection switch damaged or jumped off

Make sure whether the power supply is lack of phase, in short circuit or unconnected to ground wire, and check whether the power switch is damaged. 

Abnormal voltage

Rated voltage allowance on label ±5%

Offline 

Find and repair the offline part  

Electric organ breakdown 

Bad power switch, electromagnetic switch or fuse 

Replace it.

Overload protector, high-pressure protection switch jumped off or in bad condition 

Reset or replace it.

Poor operating capacitance

Replace it.

Bad compressor

Replace it.

Bad pressure switch 

Replace it.

Bad fan motor

Replace it.

Bad overload protector

Replace it.

Poor capacitance of blower

Replace it.

Service condition not matched or wrong operation 

Continuous startup

Restart at an interval of over 5 minutes.

Overload throughput 

Precooler overload

Precooler’s inlet temperature or environmental temperature too high 

Add cooling or improve ventilation.  

Fin of condenser or cooler jammed 

Cleanse it.

 

 

 

State

Cause

Solutions

Abnormal piping system

Piping valve not fully open 

Open the valve fully.

Small caliber

Enlarge the caliber.

Too long piping, too many elbows and joints

Redesign the piping system.

Over two air compressors in parallel operation, not matched well

Redesign the piping system

Bypass valve not fastened 

Fasten the bypass valve.

Air not past dryer

Fully open the intake valve of the precooler.  

Precooler not horizontal

Put it horizontally.

Air handling capacity exceeds rated value. 

Piping filter jammed

Cleanse the filter or replace the filter element.  

Too much air leakage on piping joint  

Check the piping. 

Evaporator’s end plate frozen

Bad pressure switch

Replace it, check the circuit, and revise the switch.

Capillary jammed

Check or replace the capillary.  

Abnormal cooling system

Cold media leakage

Fill the leakage or fill cold media.

Compressor valve wear and tear

Replace it. 

Cold media piping jammed

Change the desiccant,vacuumize it again, and fill the cold media. 

Pressure switch failure 

Replace it.

Breakdown of fan motor of condenser or cooler 

Replace it.

Abnormal dewatering effect 

Condenser fin jammed 

Cleanse it. 

Drainage valve failure or not fully open

Replace it or open the valve.

Abnormal operating pressure 

Consider to change or update the model.

Automatic drainer inclined 

Put it horizontally.

Drainer filter screen jammed

Cleanse it.

Drainpipe jammed

Cleanse it.

Drainpipe higher than automatic drainer

Reinstall the drainpipe. 

Drainage floating ball trouble

Replace it.

 

 

 

 

X. Working Condition:

Specification Sheet:

Model

 

WCD-

5SG

WCD-10SG

WCD-20SG

WCD-30SG

WCD-50GF

WCD-60GF

WCD-75GF

WCD-

100GF

WCD-

120GF

Air throughput

Nm3/min

0.85

1.5

2.5

3.5

6.5

6.5

8.5

13.5

13.8

Power supply(A)

220V 

50HZ

 

220V 

50HZ

220V 

50HZ

220V

50HZ

220V 

50HZ

220V

50HZ

220V 

50HZ

220V    

50HZ

220V    

50HZ

Compressor power(kw)

0.2

0.43

0.73

0.92

1.38

1.38

1.78

2.57

2.57

Working current(A)

1.5

2.9

3.6

4.0

6.8

6.8

8.6

10

10

Cold media filling capacity(g)

250

650

700

950

1100

1200

1400

1800

1800

Air passageway caliber

R3/4

R1

R1

R1-1/2

R1-1/2

R1-1/2

R2

R2-1/2

R2-1/2

Net weight

23.5 KG

94.5 KG

99  KG

103 KG

123 KG

170 KG

210 KG

238KG

350KG

Place type size(mm)

530

350 

450

730 

380

 910

730

 380

 910

740 

430

 940

900

 500 1290

1020

 610

 990

1010

 610 1290

1200   620   1200

1260   610   1350

 

•Cold media:口R22 口R407 口R410

 

•Working pressure:Standard: 0.7Mpa,Max:1.0Mpa 

 

•Allowable inlet temperature:≤80°C。

 

•Environmental temperature:below 35°C 

 

•Dew point temperature:2—10°C。

 

•Installation environment:draughty and dust-free place 

 

•Extra specifications available upon demand 

點(diǎn)擊次數(shù):  更新時(shí)間:2014-01-14  【打印此頁(yè)】  【關(guān)閉
上一條:沒有了  下一條:沒有了
在線交流 
【廣告電話勿擾!】
設(shè)備咨詢:
劉經(jīng)理13661495136
微信咨詢:3962913
QQ: QQ:
郵箱:tfsye@vip.163.com
電話:021-51083925
全國(guó)咨詢熱線:
400-888-3058